Eot Crane sija
video
Eot Crane sija

Eot Crane sija

eot crane girder double beam is designed and manufactured according to the standard JB/T3695-94, the car lifting mechanism uses CD:, MD hoist, is a kind of rail operation of light and small double beam eot crane girder, the working level is A3- A5, the working environment temperature is a -25-- +40 C. Compared with ordinary double-beam crane, this product has the advantages of light weight, simple structure, convenient installation and operation, especially suitable for machinery manufacturing, assembly warehouse and other places.

  • Ātra piegāde
  • Kvalitātes nodrošināšana
  • 24/7 klientu apkalpošana
Produkta ievads

1. Product Introduction:

Dejun brand eot crane girder double beam is designed and manufactured according to the standard JB/T3695-94, the car lifting mechanism uses CD:, MD hoist, is a kind of rail operation of light and small double beam eot crane girder, the working level is A3- A5, the working environment temperature is a -25-- +40 C. Compared with ordinary double-beam crane, this product has the advantages of light weight, simple structure, convenient installation and operation, especially suitable for machinery manufacturing, assembly warehouse and other places.

 

Large-tonnage overhead cranes generally have two hoisting systems: the main hoisting system and the auxiliary hoisting system, which can also be called the main hook and the auxiliary hook.

 

 

In general, the main hook has a large lifting tonnage, a slow lifting speed and low efficiency; the auxiliary hook has small lifting tonnage, fast lifting speed and high efficiency; the two hooks of the crane are generally operated independently. In special cases, the main and auxiliary hooks can also be used together to complete the operation process. The working Class is different according to the working conditions: A5-A8.

 

Double Beam Eot Crane price

2. Component:

The hoisting action of the crane, the operation of the trolley and the operation of the trolley work together to form a three-dimensional space, so that the material can be hoisted to any position in the hoisting workspace.

 

Large-tonnage overhead cranes generally have two sets of hoisting systems, which are mainly composed of box bridges, hoisting trolleys, cart operating mechanisms and electrical control systems. The retrieval device is the two hooks on the lifting trolley.

 

 

The auxiliary hook plays an auxiliary role and can also be used to lift heavy objects alone. The lifting speed is faster than the main hook, which can improve the lifting efficiency of light goods. But the lifting weight is lower than the main hook, about 1/5~1/3 of the main hook. Generally, it is a better choice to use the auxiliary hook when the hoisting weight is relatively light and the speed requirement is relatively high.

 

3. Wearing Parts of eot crane girder:

 

4. How to operate eot crane girder?

 

 

5. Preparation work before installation of eot crane girder

(1) Pretreatment of repurchased material

 

Pretreatment includes: preliminary correction of I-beams and channel steels.

Requirements: Straight and no deformation; all profiles will be rust-removed, dust-removed, and then sprayed with an anti-rust primer, and after the primer is dry, spray a matte gray topcoat twice.

 

(2) Install the base layer on transportation and hoisting

 

 

 

 

(3) Check the length of the crane running track and the size of the running span.

 

<5mm)

 

(4) Check construction equipment

 

6.Frequently Asked Questions
(1) What kinds of products do you have?


(2) Could we buy spare parts in local once they are out of work?


(3) Do you have engineer oversea installation service?

Populāri tagi:

Jums varētu patikt arī

(0/10)

clearall